Opens in a new tab

Temporary access bridges

Durable steel bridges for temporary crossings

Ateno’s Finnish-made steel access bridges are designed for safe crossings over trenches, ditches and other obstacles in the terrain. They are particularly suitable for road and street construction and other projects where vehicles and pedestrians need to continue crossing trenches and construction areas.

The bridges are designed to withstand a bogie load of 15 tonnes. The strength calculations are based on varying loads and consider how the load is transferred from the vehicle’s tyres to the bridge through the tyre contact patch. This calculation method reflects actual loading conditions. The bridge can withstand its design load without significant changes in shape.

The straight centre section and tapered ends make it easier for vehicles to cross the bridge. The straight design improves safety and makes transport, stacking, storage and handling easier.

The access bridges are available in four lengths: 4.8 m, 6 m, 8 m and 10 m. All models are 1.5 m wide. The maximum trench width ranges from 3.0 to 5.5 metres, depending on the model.

Applications

  • Road and street construction where vehicle traffic needs to be directed across trenches.
  • Earthworks and construction sites requiring temporary access routes for vehicles and machinery.
  • Pipe, cable and district heating projects where trenches interrupt existing access routes.
  • Off-road and energy infrastructure projects involving crossings over ditches, streams or other obstacles, or access across soft ground.
  • Event sites requiring temporary access routes for service vehicles and pedestrians, for example.

Technical specifications and size options

  • Bridge 4800

    Bridge 4800

    Product code
    AS10017
    Dimensions (W × L)
    1500 × 4800 mm
    Max. trench width
    3.0 m
    Weight
    600 kg
    Max. bogie load
    15 t
  • Bridge 6000

    Bridge 6000

    Product code
    AS10000
    Dimensions (W × L)
    1500 × 6000 mm
    Max. trench width
    3.5 m
    Weight
    757 kg
    Max. bogie load
    15 t
  • Bridge 8000

    Bridge 8000

    Product code
    AS10010
    Dimensions (W × L)
    1500 × 8000 mm
    Max. trench width
    4.0 m
    Weight
    1233 kg
    Max. bogie load
    15 t
  • Bridge 10000

    Bridge 10000

    Product code
    AS10021
    Dimensions (W × L)
    1500 × 10000 mm
    Max. trench width
    5.5 m
    Weight
    1817 kg
    Max. bogie load
    15 t

The trench width and bogie load must remain within the specified limits. The bridges must be installed on a level, load-bearing surface in accordance with the instructions for use.

Accessories

  • Access bridge railing

    Access bridge railing

    A yellow-painted steel railing is available for the access bridges and is attached to the side of the bridge with screws. A separate mounting beam allows commonly used plastic barriers to be attached to the bridges.

  • Cover plate for lifting and securing point

    Cover plate for lifting and securing point

    A cover plate for the lifting and securing point is also available as an accessory. The cover plate is screwed into place from the top of the bridge.

Manufacturing and standards

Ateno’s access bridges are designed and manufactured in accordance with the following standards:

  • SFS-EN 1990 – Basis of structural design.
  • SFS-EN 1993-1-1 – Eurocode 3: Design of steel structures.
  • SFS-EN 1090-2+A1 – Technical requirements for the execution of steel structures.
  • SFS-EN ISO 3834-3 – Standard quality requirements for welding.

The strength calculations are based on a bogie load of 15 tonnes and a span of 1.2 m.

Manufacturing is based on design documentation, drawings and traceable material certificates. All welding is carried out by qualified welders. Quality control follows Ateno’s quality assurance manual.

The access bridges are supplied with certification of strength calculations and conformity with applicable requirements, as well as instructions for use.

Installation and safe use

The access bridge must be installed on a level, load-bearing surface. Downward-pointing arrows on the side of the bridge indicate the maximum trench width. The marked trench width must not be exceeded.

The bogie load must not exceed 15 tonnes when the bridge is in use.

Learn more

Looking for access bridges for equipment rental companies or construction sites? Contact us to get more information about our bridge models, features and deliveries: Markku Mikkonen, tel. 050 4944 307, markku.mikkonen@ateno.fi.

Request a quote for access bridges